Our Steps of Work

Our steps of work

1 – Our trained Technician will accurately diagnose the source of the leak during your free quote.

2 – DEGROUT/REMOVE OLD SEALANT

We start by removing all aged grout from the shower perimeter, hob joints, floor waste, wall- to-wall junctions and old sealants from shower screen, walls and taps.

Additional floor and wall grout replacement available, ask your technician for quote.

3 – GRIND

For better adherence of the product and to properly clean away the old residue we utilize a die grinder. This process ensures correct product installation and a longer lasting finish.

4 – REGROUT FLOOR AND JOINTS

The grout is replaced with one of our exclusive 2-part epoxies – WP85seal or WP85grout epoxy. A high-quality sealant is also applied to the shower floor. Perimeter joints are sealed using our extremely flexible sealant helping to protect tiles from cracking due to the natural movement of buildings.

5 – RESEAL WALLS

A high-quality, mould resistant sealant is then applied to the walls, shower screen and taps to guarantee every surface is sealed. The essential final step is to spray our water barrier sealant that creates an extra layer of protection to your shower area.

They entire process takes only 3-4 hours and the shower is ready to use the next day.